2025-10
2025-09
As of now, the Internet of Things (IoT) online rate of the BaiKouQuan Oil Production Plant in Xinjiang Oilfield has remained stable at 98%, with data accurac…
2025-09
As of September 10th, Dagang Oilfield has carried out differentiated water injection management in 40 key blocks, achieving a reduction in natural decline …
2025-09
On August 25th, it was learned that the Gao166-77 well, drilled by the Fourth Drilling Company of Bohai Drilling,
2025-08
Since the beginning of this year, Daqing Petrochemical Company has been adjusting the material flow in the oil refining area based on the principle of
2025-08
The sealing surface of a valve is its core component. The leakage forms of the sealing surface can generally be classified into several types, namely, leakag…
2025-08
2025-08
On August 5th, with the successful completion of a horizontal well at the Guping 41-52 well site, the number of wells in the Changqing Heshui Oilfields tig…
2025-08
Proper selection and installation of steam traps can prevent freezing as long as there is steam passing through. However, if the steam supply is interrupted,…
2025-07
As of now, the Tuha Oilfield has completed 46 various plans for capacity construction and other aspects this year, with the design compliance rate reaching *…